1. Burner maintenance

After 150 hours of burner operation, an alarm is activated informing about the necessity of device maintenance. It is recommended to clean the gas burner after 2 or 3 maintenance alarms. However, when there are problems with the burner power, flame and ignition control, or temperatures, it should be cleaned immediately. The cleaning process in the following steps is shown in the pictures below. Necessary tools: flat head screwdriver and cross, 10 spanner, compressed air.io.

More information
2. Burner maintenance - new type

After 150 hours of burner operation, an alarm is activated informing about the necessity of device maintenance. It is recommended to clean the gas burner after 2 or 3 maintenance alarms. However, when there are problems with the burner power, flame and ignition control, or temperatures, it should be cleaned immediately. The cleaning process in the following steps is shown in the pictures below. Necessary tools: flat head screwdriver and cross, 10 spanner, compressed air.

More information
3. Bearing – cleaning and lubrication

Bearing location: Front of the drum Each time after 150 hours of work of the device (burner), it is necessary to inspect the drum bearing. If the grease used to reduce friction in the bearing is black or has reduced its volume significantly, the cleaning and lubrication process should be started.

More information
4. Drum gap setup

The machine is delivered with a pre-set drum gap. However, due to the temperature and operation of the drum, parts may shift from time to time. Then you can hear a characteristic grinding sound. The process of setting the drum gap should then be performed.

More information
5. Frequent maintenance

In order to ensure trouble-free operation of the coffee roasting line, frequent maintenance activities should be performed in the areas indicated. This way you will avoid unnecessary problems related to the operation of the device.

More information
6. Connect computer with automatic roaster

STEP 1: Use the cable to connect controller port in electrical cabinet to computer.

STEP 2: Open uptaded Artisan version and follow steps. It’s free software to download from artisan scope website. For example we used our SR5 automatic version.

More information
7. Drum flap maintenance

Lubricate the discharge drum flap in the machines presented below every 150 hours of operation (same as drum bearings). For lubrication using a grease gun, please use grease suitable for contact with high temperatures above 250 oC.

More information
Your cart
We respect your privacy!
Welcome! We use cookies to ensure the correct functioning of the website. We may also use our own and our partners' cookies for analytical and marketing purposes, in particular to match advertising content to your preferences. The use of analytical and marketing cookies requires your consent, which you can give by clicking "Accept". If you would like to adjust your consents for us and our partners, go to "Manage cookies". You can withdraw your consent at any time by changing the settings you have selected.